Welcome to the CCLEX Press Room

This page is for members of media, bloggers, and publishers to get the latest information on the Cebu-Cordoval Link Expressway or CCLEX. Please bookmark this page for easy access to updates on the biggest infrastructure project in Cebu.

You are free to use any of the materials on this site for your news reports and articles about CCLEX.

If you need clarification or more information, please contact Ms. Jasmin G. Suma-oy, Manager of CCLEC Communication and Stakeholders Management through her email [email protected].

BRAND ASSETS

The name of the project is Cebu-Cordova Link Expressway (CCLEX).

The corporation building it is the Cebu Cordova Link Expressway Corporation (CCLEC), a subsidiary company of the Metro Pacific Tollways Corporation (MPTC), the leading toll road developer in the ASEAN region. Please remove the dash between Cebu Cordova when printing the company name.

LOGO

You can download a high-resolution copy of our logo by clicking on the image below. All graphic images can be accessed in this online drive (Click here).

 

 

 

 

PROJECT UPDATES

As of September 2020, the overall Engineering, Procurement and Construction (EPC) progress of the P30-billion Cebu-Cordova Link Expressway (CCLEX) project stands at 61.18 percent. Construction alone is at 48.37 percent.

Our team has also installed the first stay cable at Tower 2. We have started the installation of stay cables that will hold the bridge deck. Varying in length between 60 meters to 210 meters, there will be 14 stay cables on each side of the bridge’s two towers, all anchored on the pylon and the deck. Each cable will contain 68-120 stay cable strands inside, and sheathed in high-density polyethylene (HDPE).

PRESS RELEASE

PROJECT PHOTOS

You can download high resolution images of latest project photo updates through our shared online drive (Click Here) You can download high-resolution version of the individual photos by clicking on the images below.